How Long Does a Construction Draw Inspection Take?

CONSTRUCTION INSIGHTS

How Long Does a Construction Draw Inspection Take?

Timeline from draw inspection site visit to written report within 48 hours, lender review and funding

The time on site depends on the size of the project and how much work has been done since the last draw. Adkins Construction Group typically delivers the written report within 48 hours of the visit.

What Affects the Time on Site

Project size, the number of line items, access to the site and whether stored materials need to be checked all affect how long the visit takes.

How to Keep It Moving

Have the current draw request, budget and any change orders ready, and make sure someone can give access to all areas of the work.

From Visit to Funding

After the report is delivered, the lender reviews it and funds the draw according to its own process.