How Should a Builder Prepare for a Draw Inspection?

Submit a draw request that matches the work in place, make sure the inspector can get on site, and have someone available to walk the job. Most delays come from access problems and from requests that run ahead of the work.

Before the Visit

  • Request each line item at the percentage actually in place, not the percentage scheduled

  • Keep the request in the same line items as the approved budget

  • Send the gate code, lockbox code and an on-site contact with the request

  • List any stored materials and have the invoices ready

During the Visit

Walk the inspector through the areas being billed. Point out work that will be covered before the next visit, such as underground utilities or in-wall rough-in. Dated photos taken before the work is covered help support those lines.

After the Visit

Our reports go to the lender within 48 hours of the site visit. If a line comes in lower than requested, it can usually be requested again on the next draw once the work is in place.