Article 1 Is the Baseline for Everything That Follows


What an owner should establish before an owner's representative's services begin

SCHEDULE A CONSULTATION

The first article of AIA C104-2024 is titled Initial Information. It records the facts about the project that the rest of the agreement is built on: what is being built, where, for how much, on what schedule and with whom.

It can look like a form to fill in and move past. It is more important than that. The information helps the parties set the owner's representative's services, schedule and fee, so gaps here can turn into disagreements later.

AIA's own instructions for C104 tell the parties to be as explicit and detailed as possible when they complete Article 1. That advice is worth taking seriously.

What Article 1 Asks the Parties to Record

Section 1.1 records the information the parties know when they sign. They can identify items that are unknown or do not apply. Article 1 also covers material changes and how the parties will exchange and use digital project information. Two parts deserve particular attention.

The owner's schedule. The parties set out the owner's anticipated design and construction schedule, including design phase milestone dates. AIA explains that those dates carry into the representative's initial schedule for its own services. Vague dates make it harder to plan the work around the owner's milestones.

The owner's representative's own team. The agreement asks which consultants and contractors the owner's representative will retain. If the representative expects to retain a cost estimator, scheduler or inspector, identify that role here.

Article 1 also includes a place for other initial information the agreement is based on. Use it. Record funding deadlines with the anticipated funding sources. Describe an occupied building with the site information, and record a phased move-in or other assumption wherever the parties can find it.

What Owners Should Have Settled Before Signing

From an estimator's and field perspective, these are the pieces of project information that most often decide whether an owner's representative engagement starts on solid ground.

  • The program. What the building must do: spaces, sizes, uses and any must-haves. A program that is still moving is fine, as long as everyone knows it is still moving.

  • The site. Location, known conditions, utilities and anything unusual, such as an occupied building, poor soils or limited access. Site conditions can affect both cost and schedule.

  • The budget. What the owner can spend on the whole project. Identify what the construction allowance covers and where design fees, furnishings, equipment and contingency are carried. An unclear answer can leave costs out of the budget.

  • The schedule. Funding dates, required occupancy and design milestones. The owner's representative plans its own work around these dates.

  • The delivery method. Design-bid-build, construction manager at risk or design-build. Each can change when the owner's representative is busiest and what it reviews.

  • The team. Who the architect, engineers and contractor are or will be, and who on the owner's side makes decisions. Identify who can approve decisions for the owner and document any authority delegated to the representative.

None of these have to be final. Record what is known and identify what is still open, so everyone starts from the same picture.

When the Initial Information Changes

Projects change. A program grows, a site turns up surprises, a funding date moves or the owner switches delivery methods. When that happens, the owner's representative's work may change with it.

Section 1.2 addresses material changes to the starting information. The owner and representative adjust the representative's services, schedule and fee as appropriate. The owner also adjusts the project budget and anticipated project schedule as needed. Owners should read how their agreement handles changes before they sign, not after the project shifts.

The practical lesson is simple: the more complete Article 1 is at the start, the easier it is to tell what actually changed later, and the fewer surprises there are for either party.

The ACG Perspective

An assumption left unwritten at the start can become a problem later: a budget that did not include equipment, a schedule that ignored a funding date, or a decision-maker nobody named.

Adkins Construction Group is built on 36 years in construction: in the field, in architectural inspection, in project management and in estimating. We help owners pull this information together before they sign an owner's representative agreement, including testing the budget against the program and the site so the starting numbers are realistic.

A project plan, preliminary budget, and milestone schedule laid out for review.

Key Takeaways

  • Article 1 of C104-2024 is the baseline the rest of the agreement is built on

  • Be explicit and detailed, as AIA's instructions advise

  • Record the owner's anticipated milestones and identify the representative's own consultants and contractors where known

  • Program, site, budget, schedule, delivery method and team should all be settled enough to write down, with open items identified

  • Material changes call for appropriate adjustments to the representative's services, schedule and fee, and to the owner's budget and schedule as needed

Continuing the Construction Insights Series

Our next Construction Insight examines Article 2 of AIA C104-2024: the Owner's Representative's Responsibilities, including the standard of care and what the owner's representative is and is not responsible for.

Reference

American Institute of Architects / AIA Contract Documents. Instructions: C104-2024, Standard Form of Agreement Between Owner and Owner's Representative.

This article is for general information and is not legal advice. Consult an attorney before completing or modifying any AIA contract document.

How Can We Help With Your Project?

Adkins Construction Group helps owners set up their projects, agreements and teams before construction begins.